Southwestern Energy completes acquisition of GEP Haynesville
The transaction builds further scale in the Haynesville
The transaction builds further scale in the Haynesville
Chemical batteries, especially lithium-ion batteries, offer an optimum solution for the green energy transition.
The execution of the deal is expected to commence in November 2022, with the setting up of units, across Ghana, over a period of two years
The first 100 MW electrolyser is scheduled to go into operation in 2024 and the second by mid-2025
The plant will produce enough hydrogen to produce 20,500 tonnes of ammonia per year, which converts into between 60,000 and 80,000 tonnes of green fossil free mineral fertilizer.
It is India’s first green hydrogen based energy storage project and would be a precursor to large scale hydrogen energy storage projects
However, commercialization of hydrogen fuel buses has not been undertaken in India so far
Refiners are setting up large scale electrolysers to produce Green Hydrogen from water and thereby decarbonize hydrogen production
The acquisition is expected to close by year end.
During the nine months of 2021, India has so far added over 7.4 gigawatts (GW) of solar, registering 335% increase over the same period last year
As part of this contract, thyssenkrupp will develop, procure and manufacture the system based on its 20 megawatt (MW) module for alkaline water electrolysis
Study estimates that carbon capture facilities could initially capture approximately 2 million tonnes of CO2 per year
India has started importing crude oil from the USA, Russia, Canada, Australia, Brazil, Guyana, Norway, Egypt, Gabon, Ghana, Congo, Equatorial Guinea, Libya, and Nigeria
BayoGaaS Hydrogen Hub will produce 1,000 kilograms per day of low-cost, low-carbon hydrogen for transportation, industrial use
TAQA, Mubadala and ADNOC will partner under the Abu Dhabi Future Energy Company (Masdar) brand
Located on the Del Rio Dairy farm, the facility will be fueled by the onsite supply of livestock manure to produce more than 40 GWh of biomethane per year
The new plant will produce and fuel with green hydrogen a direct steel ore reduction furnace with a capacity to produce 2 million tonnes of pig iron, which would allow the production of green steel with a 95% reduction of CO2 emissions
The company also announced it is on track to meet its 2025 greenhouse gas emission-reduction plans by year-end 2021.
It is anticipated that green hydrogen demand in India for applications such as refineries, fertilizers and city gas grids will grow up to 2MMTPA by 2030
Present alcohol/ethanol distillation capacity in the country is around 722 crore litres per annum which has to be increased to estimated 1,500 crore litres per annum to meet the requirement of 20% ethanol blending
Subscribe To Our Newsletter & Stay Updated