ABB joins forces with Swedish startup Syre to power Vietnam’s first textile-to-textile recycling plant
The proposed plant, located in Gia Lai province, will recycle polyester from used textiles and industrial waste into new polyester material
The proposed plant, located in Gia Lai province, will recycle polyester from used textiles and industrial waste into new polyester material
The milestone positions KBL at the forefront of global pump manufacturing
Tech major pins hopes on new cap technology
The project will deliver a full technical and integrity assessment of the refinery’s units and equipment, along with Phase 1 and 2 rehabilitation studies for the 150,000 barrels-per-day facility
The project covers design, supply, installation, commissioning, and operation of one of India’s largest polymer flooding facilities over a 10-year period
The partnership will deliver integrated access control and video management in a single cloud platform, designed to be easy to deploy, scale, and manage
The projects will transform post-consumer and post-industrial polyolefin waste into high-quality compounded r‑polymers with technical properties matching virgin materials
Under the deal, ABB will supply 35 synchronous condensers equipped with flywheels, alongside prefabricated eHouse units
The projects will transform post-consumer and post-industrial polyolefin end-of-life materials into high-quality compounded r-polymers, matching the technical performance of virgin equivalents
The project’s first phases will focus on identifying critical upgrade and refurbishment needs across the complex
The newly introduced NDIR Hydrocarbon Gas Sensor uses advanced non-dispersive infrared (NDIR) technology
Electrified heat is no longer a future ambition—it’s becoming the new standard
The powdered additive is introduced directly into a ready-mix truck drum
The upgrade was part of the Gbaran Phase 3B – Uzu development
ATW heat pumps extract heat from the air to supply cold and hot water for hot water supply, heating, and cooling
The high-stakes agreement places KBR at the center of maintaining and optimizing operations at SATORP’s strategically critical petrochemical hub
The project, scheduled for completion by late 2029, is designed to support rapid population growth and enable up to 200,000 new household connections
Infleqtion’s QC3 project will target the discovery of high-temperature superconductors
The electrolysis specialist will develop a concept for the seamless integration of Alkaline Water Electrolysis into the plant infrastructure of the Indian-based company Juno Joule Green Energy Private Limited
The XB range targets manufacturers beginning their transition to Smart Integrated Assembly
Subscribe to our newsletter & stay updated.