Adani commissions 50 MW solar power plant
Energy

Adani commissions 50 MW solar power plant

This commissioning takes AGEL’s total operational renewable capacity to 3,520 MW, a step closer to its vision of 25 GW capacity by 2025

  • By ICN Bureau | April 13, 2021

Adani Solar Energy Chitrakoot One Limited (ASECOL), a subsidiary of Adani Green Energy Limited (AGEL), commissions 50 MW Solar Power Plant in Chitrakoot, Uttar Pradesh.

The plant has a 25 Years Power Purchase Agreement (PPA) with the Uttar Pradesh Power Corporation Limited (UPPCL) at Rs. 3.07/kwh. This commissioning takes AGEL’s total operational renewable capacity to 3,520 MW, a step closer to its vision of 25 GW capacity by 2025.

AGEL has a total renewable capacity of 15,240 MW including 11,720 MW that have been awarded and are at different stages of implementation. With this 50 MW, AGEL marks the beginning of this year’s commissioning plan with full commitment from its team, amidst continuing challenges of the COVID-19 outbreak.

Like all its other assets, the newly commissioned plant will be managed by the Adani Group’s intelligent Energy Network Operation Centre (ENOC) platform which has continuously demonstrated and aided AGEL, in achieving superior operational performance of its entire renewable portfolio spread across diverse locations in India.

Register Now to Attend NextGen Chemicals & Petrochemicals Summit 2024, 11-12 July 2024, Mumbai

Other Related stories

Startups

Chemical

Petrochemical

Energy

Digitization