Maersk and SunGas Renewables sign strategic green methanol partnership
The first facility is expected to begin operations in 2026 and have an annual production capacity of approximately 390,000 tonnes.
The first facility is expected to begin operations in 2026 and have an annual production capacity of approximately 390,000 tonnes.
Construction scheduled to start in 2023 with commercial start up in 2027
Cooperation across hydrogen, renewables and carbon capture technologies
The new PLA resin is expected to help reduce microplastics thanks to its accelerated biodegradation rate as well as reduce CO2 emissions during product lifecycles since it is made from plant-derived raw materials.
The first session of PRC Europe 2023 is dedicated to clean hydrogen impact on the downstream sector
Essar in partnership with an international player proposes to develop 7.5 MMTPA CTC
The transaction was based on an Enterprise Value of GBP 21 million.
Aramco to supply almost 45% of PKN ORLEN’s crude oil requirement under agreement
This contract covers the Engineering, Procurement services and Construction assistance (EPsCa) for the conversion of the Grandpuits refinery into a zero-crude platform oriented towards SAF.
The contract is for the execution of a new C3 splitter unit aimed at separating the mixture of propane and propylene coming from the existing fluid catalytic cracking unit
The bio-ATF plant, having non edible oils and used cooking oil as feedstock, shall be the first of its kind in India and is based on technology developed by CSIR-IIP and EIL
The Rs. 31,580 crore refinery complex will cater to the petroleum products demand of the Southern region of India and provide impetus for economic development of the region
The crude-to chemical at Ras al-Khair will convert 400,000 barrels/day (b/d) of oil into chemicals
The transaction includes shares in SeQuential Environmental Services, LLC, and Pure, LLC, as well as a UCO processing plant in Salem, Oregon
Both fuels reduce CO2 emissions compared to pure fossil fuels by at least 25% and contain at least 30% of high-quality renewable components, including a significant share of advanced renewable components
The demand outlook for the coming quarter remains solid and the company expects to do much better in the H2 FY 23 compared to H1
A final investment decision on this 400 kiloton propylene expansion project is expected towards the end of next year
The new plant is planned to have the capacity to produce up to 3.2 million tons of petrochemicals annually and include a facility to produce high-value polymers. The project is expected to start in 2023 and be completed by 2026
AFYREN has now pre-sold more than 75% of its AFYREN NEOXY factory’s targeted production volume of organic acids
The facility is part of IVL’s corporate financing strategy across a range of instruments linked to the company’s ESG and sustainability commitments
Subscribe To Our Newsletter & Stay Updated