Orion reduces air emissions with new technology at Borger, Texas, plant
The $60 million project also involved upgrading the site’s cogeneration system
The $60 million project also involved upgrading the site’s cogeneration system
Construction of the plant will be undertaken by Técnicas Reunidas through an EPC contract (engineering, procurement and construction), once the FEED is finalized and financing is closed.
The existing sulfur recovery units in the Riyadh refinery were designed and built by Technip Energies in the early 2000s.
It is a plastic-glass blend that can be injection moulded at temperatures of 130 °C
NextChem Holding accesses the high-value derivatives and bio-degradable plastics licensing markets by acquiring an 83.5% stake of the Rome-based company
Cooperation reduces CO2 emissions by up to 120,000 tons per year
MoU aims at setting up Remote Pilot Training Organization (RPTO) for agri drones
With 550 TPD sulfuric acid capacity, the project is to be delivered within 3 years
The new plant will be constructed in the coastal state of Bahia, Brazil
Durasorb Cryo-HRU provides an effective solution for removal of trace heavy hydrocarbons (HHCs) and water from lean natural gas feeds for cryogenic processing
The project will use 44.01’s Earthshot prize-winning Carbon Capture and Mineralization (CCM) technology to eliminate CO2 from the atmosphere
The overall contract value to the joint venture for the early engineering and procurement works on the onshore facilities is approximately USD 80 million.
Phillips 66 Limited’s Humber Refinery carbon capture facility plans are part of the Humber Zero project
The Sierra plant is the world's first commercial-scale plant to use household rubbish as a feedstock which would otherwise be destined for landfill.
The project will focus on testing Advent’s methanol-powered HT-PEM fuel cells as a source of marine auxiliary power. During the course of the project, the fuel cell system will undergo a risk assessment by a leading international classification society
Out of installed capacity of 211 GW of coal thermal power plants in India, FGD equipment has been ordered only for 87 GW and the remaining 124 GW power plants have yet to order this FGD equipment
Total planned investment will be around Rs 235 crore.
ATR is one of the most suitable options for specific larger scale low-carbon hydrogen production facilities
The two hydrogen liquefiers are scheduled for delivery in Q2-Q3 2024 and will serve TC Energy facilities in North America that are not yet operational
Samsung Engineering will be in charge of the major ethylene production facilities with its scope of work including furnaces, C2 hydrogenation, hydrogen purification unit and three main compressors. CTCI will be in charge of the utility infrastructure, including steam/condensate collecting and boiler feed water, among others
Subscribe To Our Newsletter & Stay Updated